One of the first steps in developing an architecture is to
identify the transportation services that are important to the
Region. In the Lufkin workshops, the National ITS Architecture Market
Packages were reviewed and prioritized based on the relevance of the
services provided to Lufkin. The following table lists
each Market Package and its applicability to the Lufkin Region.
Area |
Market Package |
Market Package Name |
Status |
Traffic Management |
ATMS01 |
Network Surveillance |
Existing |
ATMS02 |
Probe Surveillance |
Future |
ATMS03 |
Surface Street Control |
Existing |
ATMS04 |
Freeway Control |
Not Planned |
ATMS05 |
HOV Lane Management |
Not Planned |
ATMS06 |
Traffic Information Dissemination |
Future |
ATMS07 |
Regional Traffic Control |
Future |
ATMS08 |
Traffic Incident Management System |
Future |
ATMS09 |
Traffic Forecast and Demand Management |
Not Planned |
ATMS10 |
Electronic Toll Collection |
Not Planned |
ATMS11 |
Emissions Monitoring and Management |
Not Planned |
ATMS12 |
Virtual TMC and Smart Probe Data |
Not Planned |
ATMS13 |
Standard Railroad Grade Crossing |
Existing |
ATMS14 |
Advanced Railroad Grade Crossing |
Not Planned |
ATMS15 |
Railroad Operations Coordination |
Future |
ATMS16 |
Parking Facility Management |
Future |
ATMS17 |
Regional Parking Management |
Not Planned |
ATMS18 |
Reversible Lane Management |
Not Planned |
ATMS19 |
Speed Monitoring |
Future |
ATMS20 |
Drawbridge Management |
Not Planned |
ATMS21 |
Roadway Closure Management |
Future |
Maintenance and Construction |
MC01 |
Maintenance and Construction Vehicle and Equipment Tracking |
Future |
MC02 |
Maintenance and Construction Vehicle Maintenance |
Future |
MC03 |
Road Weather Data Collection |
Future |
MC04 |
Weather Information Processing and Distribution |
Future |
MC05 |
Roadway Automated Treatment |
Not Planned |
MC06 |
Winter Maintenance |
Not Planned |
MC07 |
Roadway Maintenance and Construction |
Future |
MC08 |
Work Zone Management |
Future |
MC09 |
Work Zone Safety Monitoring |
Future |
MC10 |
Maintenance and Construction Activity Coordination |
Future |
Public Transportation |
APTS1 |
Transit Vehicle Tracking |
Future |
APTS2 |
Transit Fixed-Route Operations |
Future |
APTS3 |
Demand Response Transit Operations |
Future |
APTS4 |
Transit Passenger and Fare Management |
Future |
APTS5 |
Transit Security |
Future |
APTS6 |
Transit Maintenance |
Not Planned |
APTS7 |
Multi-modal Coordination |
Future |
APTS8 |
Transit Traveler Information |
Future |
Traveler Information |
ATIS1 |
Broadcast Traveler Information |
Future |
ATIS2 |
Interactive Traveler Information |
Not Planned |
ATIS3 |
Autonomous Route Guidance |
Not Planned |
ATIS4 |
Dynamic Route Guidance |
Not Planned |
ATIS5 |
ISP Based Route Guidance |
Future |
ATIS6 |
Integrated Transportation Management/Route Guidance |
Not Planned |
ATIS7 |
Yellow Pages and Reservation |
Not Planned |
ATIS8 |
Dynamic Ridesharing |
Not Planned |
ATIS9 |
In Vehicle Signing |
Not Planned |
Commercial Vehicle Operations |
CVO01 |
Fleet Administration |
Not Planned |
CVO02 |
Freight Administration |
Not Planned |
CVO03 |
Electronic Clearance |
Not Planned |
CVO04 |
CV Administrative Processes |
Future |
CVO05 |
International Border Electronic Clearance |
Not Planned |
CVO06 |
Weigh-In-Motion |
Not Planned |
CVO07 |
Roadside CVO Safety |
Not Planned |
CVO08 |
On-board CVO and Freight Safety and Security |
Not Planned |
CVO09 |
CVO Fleet Maintenance |
Not Planned |
CVO10 |
HAZMAT Management |
Future |
CVO11 |
Roadside HAZMAT Security Detection and Mitigation |
Not Planned |
CVO12 |
CV Driver Security Authentication |
Not Planned |
CVO13 |
Freight Assignment Tracking |
Not Planned |
Emergency Management |
EM01 |
Emergency Call-Taking and Dispatch |
Future |
EM02 |
Emergency Routing |
Future |
EM03 |
Mayday Support |
Not Planned |
EM04 |
Roadway Service Patrols |
Not Planned |
EM05 |
Transportation Infrastructure Protection |
Not Planned |
EM06 |
Wide-Area Alert |
Future |
EM07 |
Early Warning System |
Not Planned |
EM08 |
Disaster Response and Recovery |
Not Planned |
EM09 |
Evacuation and Reentry Management |
Future |
EM10 |
Disaster Traveler Information |
Future |
Archived Data Management |
AD1 |
ITS Data Mart |
Future |
AD2 |
ITS Data Warehouse |
Not Planned |
AD3 |
ITS Virtual Data Warehouse |
Not Planned |
Vehicle Safety Systems |
AVSS01 |
Vehicle Safety Monitoring |
Not Planned |
AVSS02 |
Driver Safety Monitoring |
Not Planned |
AVSS03 |
Longitudinal Safety Warning |
Not Planned |
AVSS04 |
Lateral Safety Warning |
Not Planned |
AVSS05 |
Intersection Safety Warning |
Not Planned |
AVSS06 |
Pre-Crash Restraint Deployment |
Not Planned |
AVSS07 |
Driver Visibility Improvement |
Not Planned |
AVSS08 |
Advanced Vehicle Longitudinal Control |
Not Planned |
AVSS09 |
Advanced Vehicle Lateral Control |
Not Planned |
AVSS10 |
Intersection Collision Avoidance |
Not Planned |
AVSS11 |
Automated Highway System |
Not Planned |