Regional Architecture Logo
 

Send Your Comments

E-Mail

Roadside Signal Priority Equipment Package

Architecture Geographic Scope

Description:

This Equipment package shall provide the capability to receive vehicle signal priority requests and control roadside signals accordingly.

 

Included in:

City of Laredo Field Equipment
TxDOT Laredo Traffic Signals

Processes:

1.2.7.1Process Indicator Output Data for Roads
1.2.7.3Manage Indicator Preemptions
  

User Service Requirements (fully or partially addressed):

1.0TRAVEL AND TRAFFIC MANAGEMENT
1.5.2TSI shall include an Information Access function that allows travelers to access the available information.
1.5.2.5Information Access shall provide the capability for travelers to access the TSI information via any of, but not limited to, the following methods:
1.5.2.5(a)Highway advisory radio.
1.6TRAFFIC CONTROL
1.6.0ITS shall include a Traffic Control (TC) function. Traffic Control provides the capability to efficiently manage the movement of traffic on streets and highways. Four functions are provided, which are, (1) Traffic Flow Optimization, (2) Traffic Surveillance, (3) Control, and (4) Provide Information. This will also include control of network signal systems with eventual integration of freeway control.
1.6.3TC shall include a Device Control function.
1.6.3.3The Device Control function shall provide the capability to exercise control over those devices utilized for traffic control.
1.6.3.3.1Device Control shall include the capability to control traffic signalization, including rapid modification of signalization parameters to respond to traffic requirements.
1.6.3.3.2Device Control shall include the capability to dynamically control traffic signing.
1.6.3.3.4Device Control shall include the capability to exercise dynamic control over the infrastructure (such as reversible-lanes, turning restrictions, etc.).
1.6.3.4Device Control shall communicate control data to the following devices.
1.6.3.4(a)Traffic signals.
1.8TRAVEL DEMAND MANAGEMENT
1.8.0ITS shall include a Travel Demand Management (TDM) function. Travel Demand Management will generate and communicate management and control strategies that will support and facilitate the implementation of TDM programs, policies and regulations. It consists of two major functions, which are, (1) Increase Efficiency of Transportation System and (2) Provide Wide Variety of Mobility Options.
1.8.2TDM shall include a processing function.
1.8.2.8The processing function's generation of management and control strategies for HOV facilities shall include as factors, but not be limited to, the following:
1.8.2.8(a)Auto occupancy requirements.
1.8.2.8(b)Priority for selected vehicle types at ramps.
1.8.2.8(c)Priority for selected vehicle types at signalized intersections.
1.8.3TDM shall include a sensors/control function.
1.8.3.1The sensors/control function shall provide the capability to gather information needed for the generation of management and control strategies to include, but not be limited to the, following:
1.8.3.1(c)Vehicle occupancy.
1.10HIGHWAY RAIL INTERSECTION
1.10.3At all HRIs with active railroad warning systems, HRI shall manage the traffic in the intersection.
1.10.3.1HRI shall be capable of augmenting the intersection with standard highway traffic signal devices.
1.10.3.3HRI shall provide an Intelligent Intersection Controller (IIC) function to manage highway and rail traffic in the intersection.
1.10.3.3.2IIC function shall control active railway warning devices, including flashing lights and physical barriers for highway and walkway lanes at HRIs.
1.10.3.3.3IIC function shall provide an intersection surveillance system to derive the real-time status of traffic in the intersection.
1.10.4HRI shall include a Standard Speed Rail (SSR) Subservice to manage highway and rail traffic at HRIs for rail lines with operational speeds less than 80 MPH.
1.10.4.1SSR shall include active railroad warning systems at designated HRIs.
1.10.4.2SSR shall include passive HRIs with non-active warning systems.
1.10.4.2.1SSR shall augment passive warning signs with additional highway traffic control devices at passive HRIs.
1.10.5HRI shall provide a High Speed Rail (HSR) Subservice for HRIs on rail lines with operational speeds between 80 and 125 MPH.
1.10.5.1HSR shall include active roadside message devices to provide highway closure information at HSR HRIs.
1.10.5.2HSR shall provide special safety features to enhance safety.
1.10.5.2.2HSR shall include a positive barrier function (e.g. four quadrant gates) to close the intersection to highway traffic for rail lines operating at speeds over 110 MPH.
5.0EMERGENCY MANAGEMENT
5.2EMERGENCY VEHICLE MANAGEMENT
5.2.3EVM Service shall include a Signal Priority System.
8.0MAINTENANCE AND CONSTRUCTION MANAGEMENT
8.1MAINTENANCE AND CONSTRUCTION OPERATIONS
8.1.2Maintenance and Construction Operations shall provide a Roadway Management (RWM) function to monitor traffic, road surface, and environmental conditions and forecast traffic and road surface conditions to support management of routine and hazardous road condition remediation and to communicate changes in conditions. This function includes interactions among Traffic Managers, Supervisors, Dispatchers, Field Crews, Construction Crews, Asset Managers, Planning Agencies, and Weather Services Organizations.
8.1.2.1RWM shall support a number of different services, including but not limited to:
8.1.2.1(e)Repair activities
  
The detailed process and user service requirement traceability information on this page was extracted from the National ITS Architecture. Consult the National ITS Architecture web site for more information.

Last updated on 06-14-2003 using Ronald C. Ice and Associates Web Spinner Technology.