hri control data
(Future)
Data required for HRI information transmitted at railroad grade crossings and within railroad operations.
hri request
(Future)
A request for highway-rail intersection status or a specific control request intended to modify HRI operation.
hri status
(Existing)
Status of the highway-rail intersection equipment including both the current state or mode of operation and the current equipment condition.
request for right-of-way
(Future)
Forwarded request from signal prioritization, signal preemption, pedestrian call, multi-modal crossing activation, or other source for right-of-way.
signal control data
(Existing)
Information used to configure and control traffic signal systems.
signal control status
(Existing)
Status of surface street signal controls.