Regional Architecture Logo
 

Send Your Comments

E-Mail

Interface: City of Victoria Fire/Police/EMS Dispatch and PSAP To City of Victoria Maintenance Dispatch

Architecture Geographic Scope

City of Victoria Fire/Police/EMS Dispatch and PSAP to City of Victoria Maintenance Dispatch Interface Diagram

 

Architecture Flow Definitions

alert notification   (Future)   Applicable ITS Standards

Notification of a major emergency such as a natural or man-made disaster, civil emergency, or child abduction for distribution to the public. The flow identifies the alert originator, the nature of the emergency, the geographic area affected by the emergency, the effective time period, and information and instructions necessary for the public to respond to the alert. This flow may also identify specific information that should not be released to the public.

 

alert status   (Future)   Applicable ITS Standards

Information indicating the current status of the emergency alert including identification of the traveler and driver information systems that are being used to provide the alert.

 

incident information   (Future)   Applicable ITS Standards

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transportation system operation ranging from routine incidents (e.g., disabled vehicle at the side of the road) through large-scale natural or human-caused disasters that involve loss of life, injuries, extensive property damage, and multi-jurisdictional response.

 

incident response status   (Future)   Applicable ITS Standards

Status of the current incident response including a summary of incident status and its impact on the transportation system, traffic management strategies implemented at the site (e.g., closures, diversions, traffic signal control overrides), and current and planned response activities.

 

maint and constr resource request   (Future)   Applicable ITS Standards

Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response. The request may poll for resource availability or request pre-staging, staging, or immediate dispatch of resources.

 

maint and constr resource response   (Future)   Applicable ITS Standards

Current status of maintenance and construction resources including availability and deployment status. General resource inventory information covering vehicles, equipment, materials, and people and specific resource deployment status may be included.

 

road weather information   (Future)   Applicable ITS Standards

Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.

 

Last updated on 05-27-2005 using Ronald C. Ice and Associates Web Spinner Technology.