San Antonio Regional ITS Architecture |
TransGuide Operations Center and TxDOT Lane Control Signals(E) = Existing Flow
|
Source | Architecture Flows | Destination |
TransGuide Operations Center | freeway control data (E) | TxDOT Lane Control Signals |
TxDOT Lane Control Signals | freeway control status (E) | TransGuide Operations Center |