San Antonio Regional ITS Architecture |
TransGuide Operations Center and TxDOT Barrier Gates(E) = Existing Flow
|
Source | Architecture Flows | Destination |
TransGuide Operations Center | barrier system control (P) | TxDOT Barrier Gates |
TxDOT Barrier Gates | barrier system status (P) | TransGuide Operations Center |