Regional Architecture Logo
 

Send Your Comments

E-Mail

Interface: City of College Station Field Equipment To Rail Operators Wayside Equipment

Architecture Geographic Scope

City of College Station Field Equipment to Rail Operators Wayside Equipment Interface Diagram

 

Architecture Flow Definitions

hri operational status   (Future)   Applicable ITS Standards

Status of the highway-rail grade crossing equipment including both the current state or mode of operation and the current equipment condition.

 

track status   (Existing)   Applicable ITS Standards

Current status of the wayside equipment and notification of an arriving train.

 

Last updated on 05-01-2004 using Ronald C. Ice and Associates Web Spinner Technology.