New York Sub-Regional ITS Architecture

Element Expanded Functional Requirements: NYC DOT Division of Bridges


Functional Area: MCM Maintenance Decision Support
  1. The center shall provide the center personnel with tailored external information, including weather or road condition observations, forecasted weather information or road conditions, current usage of treatments and materials, available resources, equipment and vehicle availability, road network information, and source reliability information.
  2. The center shall tailor the decision support information to include filtering (selection from a large amount of external information), error reduction ('smoothing' the information), fusion (combination of disparate information to match the decision needs), and analysis (creating the decision).
  3. The center shall provide an interface to the center personnel to input control parameters for the decision support process and receive decisions or information presentation.
  4. The center shall provide dispatch information to maintenance and construction vehicles based on the outputs of the decision support system, including recommended roadway treatment actions.
Functional Area: MCM Incident Management
  1. The center shall receive inputs from the Alerting and Advisory System concerning the possibility or occurrence of severe weather, terrorist activity, or other major emergency, including information provided by the Emergency Alert System.
  2. The center shall exchange alert information and status with emergency management centers. The information includes notification of a major emergency such as a natural or man-made disaster, civil emergency, or child abduction. The information may include the alert originator, the nature of the emergency, the geographic area affected by the emergency, the effective time period, etc.
  3. The center shall exchange incident and threat information with emergency management centers as well as traffic management centers; including notification of existence of incident and expected severity, location, time and nature of incident.
  4. The center shall coordinate planning for incidents with emergency management centers - including pre-planning activities for disaster response, evacuation, and recovery operations.
  5. The center shall respond to requests from emergency management to provide maintenance and construction resources to implement response plans, assist in clean up, verify an incident, etc. This may also involve coordination with traffic management centers and other maintenance centers.
  6. The center shall exchange road network status assessment information with emergency management and traffic management centers including an assessment of damage sustained by the road network including location and extent of the damage, estimate of remaining capacity, required closures, alternate routes, necessary restrictions, and time frame for repair and recovery.
  7. The center shall provide work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.
  8. The center shall receive information indicating the damage sustained by transportation assets, derived from aerial surveillance, field reports, inspections, tests, and analyses to support incident management.
Functional Area: MCM Winter Maintenance Management
  1. The center shall respond to requests from emergency management and traffic management centers for hazard removal, field equipment repair, and other winter roadway maintenance.
  2. The center shall exchange information with administrative systems to support the planning and scheduling of winter maintenance activities. This information includes: equipment and consumables resupply purchase request status, personnel qualifications including training and special certifications, environmental regulations and rules that may impact maintenance activities, and requests and project requirements from contract administration.
  3. The center shall provide status information about scheduled winter maintenance activities including anticipated closures and impact to the roadway, alternate routes, anticipated delays, closure times, and durations. The information is provided to other management centers such as traffic, emergency, transit, traveler information providers, other maintenance centers, and the media.
  4. The center shall receive equipment availability and materials storage status information from storage facilities to support the scheduling of winter maintenance activities.
  5. The center shall support an interface with a map update provider, or other appropriate data sources, through which updates of digitized map data can be obtained and used as a background for the scheduling of winter maintenance activities.
  6. The center shall collect real-time information on the state of the regional transportation system from other centers including current traffic and road conditions, weather conditions, special event and incident information and use the collected information to support winter maintenance operations.
  7. The center shall dispatch and route winter maintenance vehicle drivers and support them with route- specific environmental, incident, advisory, threat, alert, and traffic congestion information.
  8. The center shall determine the need for roadway treatment based on current and forecasted weather information, current usage of treatments and materials, available resources, requests for action from other agencies, and recommendations from the Maintenance Decision Support system, specifically under winter conditions. This supports winter maintenance such as plowing, treating, anti-icing, etc.
  9. The center shall provide dispatch instructions for vehicle operators based on input parameters from center personnel, specifically for winter conditions. This could include a treatment route, treatment application rates, start and end times, and other treatment instructions.
  10. The center shall support remote control of on-board maintenance and construction vehicle systems and field equipment that is remotely controlled by the vehicle such as adjusting material application rates and spread patterns.
  11. The center shall assess the current status of all winter maintenance activities, including actual work activities performed, current locations and operational conditions of vehicles, materials and equipment inventories, field equipment status, environmental information, etc.