KIPDA Regional ITS Architecture

Interconnect: INDOT Borman TMC - INDOT CCTVs


(Click on image to view full-size)
INDOT Borman TMC - INDOT CCTVs

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
INDOT Borman TMC video surveillance control (E)
traffic sensor control (E)
INDOT CCTVs
INDOT CCTVs traffic images (E)
traffic flow (E)
INDOT Borman TMC