KIPDA Regional ITS Architecture

Interconnect: INDOT Traffic Signals - Wayside Equipment


(Click on image to view full-size)
INDOT Traffic Signals - Wayside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
INDOT Traffic Signals intersection blockage notification (P)
hri operational status (P)
Wayside Equipment
Wayside Equipment arriving train information (P)
track status (P)
INDOT Traffic Signals