KIPDA Regional ITS Architecture

Interconnect: INDOT TMC - INDOT CCTVs


(Click on image to view full-size)
INDOT TMC - INDOT CCTVs

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
INDOT TMC video surveillance control (E)
traffic sensor control (E)
INDOT CCTVs
INDOT CCTVs traffic images (E)
traffic flow (E)
INDOT TMC