KIPDA Regional ITS Architecture

Interconnect: INDOT TMC - TARC3 Paratransit System


(Click on image to view full-size)
INDOT TMC - TARC3 Paratransit System

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
INDOT TMC road network conditions (P)
TARC3 Paratransit System
TARC3 Paratransit System   INDOT TMC