|
Service Packages For: MC - MC07-1 |
|
MC07-1
Scroll down to view list of elements, responsible agencies (stakeholders), candidate functional areas and requirements, and flows on this diagram. |
|
List of Elements on this Diagram Click on Element Name to go to Element Detail Page.
|
List of Stakeholder Elements and Roles on this Diagram
Click on Element Name to go to Page with Element Details.
Click on Functional Area/Role to go to Page with Candidate Functional Requirements.
|
Stakeholder |
Element Name |
Functional Area/Role |
Functional Area Description |
CTDOT |
CTDOT Maintenance District 1 |
MCM Roadway Maintenance and Construction |
This equipment package provides overall management and support for routine maintenance on a roadway system or right-of-way. Services managed include landscape maintenance, hazard removal (roadway debris, dead animals), routine maintenance activities (roadway cleaning, grass cutting), and repair and maintenance of both ITS and non-ITS equipment on the roadway (e.g., signs, traffic controllers, traffic detectors, dynamic message signs, traffic signals, etc.). Environmental conditions information is also received from various weather sources to aid in scheduling routine maintenance activities. |
CTDOT |
CTDOT Maintenance Vehicles |
MCV Roadway Maintenance and Construction |
This equipment package includes the on-board systems that support routine non-winter maintenance on a roadway system or right-of-way. Routine maintenance includes landscape maintenance, hazard removal (roadway debris, dead animals), routine maintenance activities (roadway cleaning, grass cutting), and repair and maintenance of both ITS and non-ITS equipment on the roadway (e.g., signs, traffic controllers, traffic detectors, dynamic message signs, traffic signals, etc.). |
CTDOT |
CTDOT TMC Newington |
Traffic Equipment Maintenance |
This equipment package monitors the operational status of field equipment and detects failures. It presents field equipment status to Traffic Operations Personnel and reports failures to the Maintenance and Construction Management Subsystem. The equipment package tracks the repair or replacement of the failed equipment. The entire range of ITS field equipment may be monitored by this equipment package including sensors (traffic, infrastructure, environmental, security, speed, etc.) and devices (highway advisory radio, dynamic message signs, automated roadway treatment systems, barrier and safeguard systems, cameras, traffic signals and override equipment, ramp meters, beacons, security surveillance equipment, etc.). |
List of Flows on this Diagram Click on Architecture Flow to go to Page with Applicable ITS Standards.
|
|
|
|
|