Buffalo-Niagara Bi-National Regional ITS Architecture |
Local DPW Dispatch and OPP Dispatch(E) = Existing Flow
|
Source | Architecture Flows | Destination |
Local DPW Dispatch | maint and constr work plans ( P) current asset restrictions ( P) | OPP Dispatch |
OPP Dispatch | Local DPW Dispatch |