Buffalo-Niagara Bi-National Regional ITS Architecture |
MTO Burlington TOC and MTO Field Equipment(E) = Existing Flow
|
Source | Architecture Flows | Destination |
MTO Burlington TOC |
signal control data (
P) roadway information system data ( E) | MTO Field Equipment |
MTO Field Equipment | signal control status ( P) | MTO Burlington TOC |