Buffalo-Niagara Bi-National Regional ITS Architecture


Menu
Region Home
Stakeholders
ITS Inventory
Inventory by Stakeholder
Inventory by Entity
Sausage Diagram
Market Packages by Functional Area
Market Packages by Stakeholder
Market Package Descriptions
Equipment Package Descriptions
Architecture Flow Descriptions
Project Documents
Send Your Comments

 

ITS Element: NFBC Field Equipment

Description: Field equipment associated with the three bridges (Rainbow Bridge, Whirlpool Bridge, and Lewiston-Queenston Bridges) operated by the Niagara Falls Bridge Commission.
Status: Existing
Stakeholder: Niagara Falls Bridge Commission
Mapping: Roadway Subsystem
Other Roadway

Interfaces:

Local EMS Vehicles
Local Fire Vehicles
Local Police Vehicles
NFBC TMC
NITTEC Traffic Operations Center

Market Packages:

ATMS01 - Network Surveillance
ATMS01 - Network Surveillance
ATMS04 - Freeway Control
ATMS18 - Reversible Lane Management
EM02 - Emergency Routing
EM02 - Emergency Routing
EM02 - Emergency Routing
Equipment Packages: Roadway Basic Surveillance
Roadway Freeway Control
Roadway Reversible Lanes
Roadway Signal Priority

Last updated: 11-18-05