|
Bi-State Regional ITS Architecture |
Fort Smith Field Equipment and Rail Operators Wayside Equipment(E) = Existing Flow
|
| Source | Architecture Flows | Destination |
| Fort Smith Field Equipment | hri operational status ( P) | Rail Operators Wayside Equipment |
| Rail Operators Wayside Equipment | track status ( E) | Fort Smith Field Equipment |