Bi-State Regional ITS Architecture


Menu
Region Home
Stakeholders
ITS Inventory
Inventory by Stakeholder
Inventory by Entity
Sausage Diagram
Market Packages by Functional Area
Market Packages by Stakeholder
Market Package Descriptions
Equipment Package Descriptions
Architecture Flow Descriptions
Project Documents
Send Your Comments

 

 

 

Equipment Package: Standard Rail Crossing

Description: This equipment package manages highway traffic at highway-rail intersections (HRIs) where operational requirements do not dictate advanced features (e.g., where rail operational speeds are less than 80 miles per hour). Either passive (e.g., the crossbuck sign) or active warning systems (e.g., flashing lights and gates) are supported depending on the specific requirements for each intersection. These traditional HRI warning systems may also be augmented with other standard traffic management devices. The warning systems are activated on notification by interfaced wayside equipment of an approaching train. The equipment at the HRI may also be interconnected with adjacent signalized intersections so that local control can be adapted to highway-rail intersection activities. Health monitoring of the HRI equipment and interfaces is performed; detected abnormalities are reported through interfaces to the wayside interface equipment and the traffic management subsystem.
Included In: Fort Smith Field Equipment
Municipal ITS Field Equipment
Van Buren Field Equipment
Functional Requirements 1 - The field element shall collect and process, traffic sensor data in the vicinity of a highway-rail intersection (HRI).
2 - The field element shall monitor the status of the highway-rail intersection (HRI) equipment, including both the current state and mode of operation and the current equipment condition, to be forwarded on to the traffic management center.
3 - The field element shall monitor the status of the highway-rail intersection (HRI) equipment, including both the current state and mode of operation and the current equipment condition, to be forwarded on to the rail wayside equipment.
4 - The field element shall receive track status from the rail wayside equipment that can be passed on to the traffic management center. This may include the current status of the tracks and whether a train is approaching.
5 - The field element shall collect pedestrian images and pedestrian sensor data, and respond to pedestrian crossing requests via display, audio signal, or other manner.
6 - The field element shall control the dynamic message signs (DMS) in the vicinity of a highway-rail intersection (HRI) to advise drivers, cyclists, and pedestrians of approaching trains.
7 - The field element shall close the highway-rail intersection (HRI) when a train is approaching using gates, lights/signs, barriers, and traffic control signals.
8 - The field element shall support the integrated control of adjacent traffic signals to clear an area in advance of an approaching train and to manage traffic around the intersection.
9 - The field element shall forward rail traffic advisories received from the Wayside Equipment to the traffic management center.

Last updated: 02-09-06