GMTA Dispatch and GMTA Vehicles
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
GMTA Dispatch
transit traveler information (P)
transit schedule information (P)
secure area surveillance control (P)
secure area sensor control (P)
alarm acknowledge (P)
bad tag list (E)
transit vehicle operator information (P)
GMTA Vehicles
GMTA Vehicles
transit vehicle loading data (E)
secure area surveillance data (P)
secure area sensor data (P)
alarm notification (P)
fare collection data (E)
demand response passenger and use data (P)
transit vehicle schedule performance (P)
transit vehicle location data (P)
GMTA Dispatch
Last updated: 07-01-08