VTrans Rutland TMC and VTrans Traffic Signals
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
VTrans Rutland TMC
hri request (P)
hri control data (P)
traffic sensor control (P)
signal control data (P)
VTrans Traffic Signals
VTrans Traffic Signals
request for right-of-way (P)
hri status (P)
traffic flow (P)
signal control status (P)
VTrans Rutland TMC
Last updated: 07-01-08