Municipal Field Equipment and Municipal TOC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Municipal Field Equipment
request for right-of-way (P)
hri status (P)
roadway information system status (P)
signal control status (E)
traffic images (E)
traffic flow (E)
Municipal TOC
Municipal TOC
hri request (P)
hri control data (P)
roadway information system data (P)
signal control data (E/P)
video surveillance control (E)
traffic sensor control (E)
Municipal Field Equipment
Last updated: 07-01-08