Municipal Field Equipment and Railroad Wayside Equipment(E) = Existing Flow
|
Source | Architecture Flows | Destination |
Municipal Field Equipment | hri operational status (P) | Railroad Wayside Equipment |
Railroad Wayside Equipment | track status (E) | Municipal Field Equipment |