Interface: Rail Operators Wayside Equipment and Municipal ITS Field Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
Rail Operators Wayside Equipment | track status (P) | Municipal ITS Field Equipment |
Municipal ITS Field Equipment | hri operational status (P) | Rail Operators Wayside Equipment |