Interface: NMDOT District 5 TOC and ITA System
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT District 5 TOC | amber alert confirmation_ud (P) threat information (P) | ITA System |
ITA System | amber alert_ud (P) alerts and advisories (P) | NMDOT District 5 TOC |