Santa Fe Regional ITS Architecture Update
Interface: NMDOT District 5 Traffic Signals and Rail Operators Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
NMDOT District 5 Traffic Signals
hri operational status (P)
Rail Operators Wayside Equipment
Rail Operators Wayside Equipment
track status (P)
NMDOT District 5 Traffic Signals
Last updated: 12-29-11