Santa Fe Regional ITS Architecture Update
Interface: City of Santa Fe Streets and Drainage Maintenance Division and City of Santa Fe Maintenance and Construction Vehicles
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
City of Santa Fe Streets and Drainage Maintenance Division
maint and constr vehicle system control (P)
maint and constr dispatch information (P)
City of Santa Fe Maintenance and Construction Vehicles
City of Santa Fe Maintenance and Construction Vehicles
work zone status (P)
maint and constr vehicle operational data (P)
maint and constr dispatch status (P)
maint and constr vehicle conditions (P)
maint and constr vehicle location data (P)
City of Santa Fe Streets and Drainage Maintenance Division
Last updated: 12-29-11