Home
Scope
Stakeholders
Stakeholders
Inventory by Stakeholder
Inventory
Inventory
Inventory by Stakeholder
Inventory by Entity
Services
Services
Services by Stakeholder
Interfaces
Architecture
Architecture Flow Descriptions
Architecture Schematic
Glossary
Feedback
Interconnect: Doha Water Taxi and Doha Water Bus /Taxi Operations Control Center
(Click on image to view full-size)
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
Doha Water Taxi
public transportation vehicle loading data (P)
public transportation traveler request (P)
emergency traffic coordination (P)
public transportation vehicle operator authentication information (P)
public transportation vehicle conditions (P)
alarm notification (P)
public transportation vehicle schedule performance (P)
public transportation vehicle location data (P)
Doha Water Bus /Taxi Operations Control Center
Doha Water Bus /Taxi Operations Control Center
broadcast traveler information (P)
public transportation traveler information (P)
public transportation schedule information (P)
request for vehicle measures (P)
public transportation vehicle operator authentication update (P)
remote vehicle disable (P)
alarm acknowledge (P)
Doha Water Taxi
Copyright © 2012 Public Works Authority (ASHGHAL) All Rights Reserved