State of Qatar ITS Architecture State of Qatar
State of Qatar ITS Architecture State of Qatar ITS Architecture State of Qatar ITS Architecture

Interconnect: QR Metro Rail Operations Control Center and QR Metro Vehicles


(Click on image to view full-size)
QR Metro Rail Operations Control Center and QR Metro Vehicles

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
SourceArchitecture FlowsDestination
QR Metro Rail Operations Control Center broadcast traveler information (P)

public transportation traveler information (P)

request for vehicle measures (P)

remote vehicle disable (P)

alarm acknowledge (P)

public transportation schedule information (P)

QR Metro Vehicles
QR Metro Vehicles public transportation traveler request (P)

emergency traffic coordination (P)

public transportation vehicle conditions (P)

alarm notification (P)

public transportation vehicle schedule performance (P)

public transportation vehicle location data (P)

QR Metro Rail Operations Control Center
Copyright © 2012 Public Works Authority (ASHGHAL) All Rights Reserved