Cincinnati (OKI) Regional ITS Architecture |
ARTIMIS Operations Control Center and CTC Transit Dispatch(E) = Existing Flow
|
Source | Architecture Flows | Destination |
ARTIMIS Operations Control Center | road network conditions (P) | CTC Transit Dispatch |
CTC Transit Dispatch | ARTIMIS Operations Control Center |