This equipment package collects and stores maintenance and construction information that is collected in the course of operations by the Maintenance and Construction Management Subsystem. This data can be used directly by operations personnel or it can be made available to other data users and archives in the region.
Included In:
ARTIMIS Operations Control Center
Functional Requirements
1 -
The center shall collect maintenance and construction data (such as field equipment status, infrastructure status, maintenance and construction activity data) gathered from roadway, traffic, and other maintenance and construction sources. 2 -
The center shall assign quality control metrics and meta-data to be stored along with the data. Meta-data may include attributes that describe the source and quality of the data and the conditions surrounding the collection of the data. 3 -
The center shall receive and respond to requests from ITS Archives for either a catalog of the maintenance and construction data or for the data itself. 4 -
The center shall be able to produce sample products of the data available. 5 -
The center shall provide data to Asset Management to be used in updating the status of assets in the inventory.