Toledo Regional ITS Architecture Update (Final)
Toledo Home
Stakeholders
Stakeholders
Inventory by Stakeholder
Services by Stakeholder
Projects by Stakeholder
Operational Concepts
Inventory
Inventory
Inventory by Stakeholder
Inventory by Entity
Services
Services
Service Package Descriptions
Services by Stakeholder
Architecture
Architecture Interfaces
Architecture Flow Descriptions
Projects
Projects
Projects by Stakeholder
Resources
How to Use Web Site
Systems Engineering Analysis
Project Documents
ITS Architecture
ITS Standards
Glossary
Feedback
Functional Requirements: MCV Vehicle Location Tracking
Description:
This on-board equipment package tracks vehicle location and reports the position and timestamp information to a dispatch center.
Functional Requirements:
The maintenance and construction vehicle shall track its current location.
The maintenance and construction vehicle shall send the time stamped vehicle location to the controlling center.
Included In:
City of Bowling Green Maintenance Vehicles
City of Toledo Maintenance Vehicles
Lucas County Maintenance Vehicles
Monroe County Maintenance Vehicles
Municipal Maintenance Vehicles
ODOT District 2 Maintenance Vehicles
Wood County Maintenance Vehicles