Description: | Tower is the source of bridge state, and tower gets advance notice for operations from large commercial river traffic. River traffic generally has the right-of-way. |
Status: | Existing |
Stakeholder: | City of Toledo |
Functional Areas: (Linked to Functional Requirements) |
ITS elements that are mapped only to terminators do not have ITS functional requirements allocated to them. |
Interfaces: (Flows) |
City of Toledo Field Equipment City of Toledo Public Safety Dispatch City of Toledo Traffic Management System |
Service Packages: |
ATMS20 - Drawbridge Management - |
Mapping: |
Multimodal Crossings |