Toledo Regional ITS Architecture Update (Final)
Toledo Home
Stakeholders
Stakeholders
Inventory by Stakeholder
Services by Stakeholder
Projects by Stakeholder
Operational Concepts
Inventory
Inventory
Inventory by Stakeholder
Inventory by Entity
Services
Services
Service Package Descriptions
Services by Stakeholder
Architecture
Architecture Interfaces
Architecture Flow Descriptions
Projects
Projects
Projects by Stakeholder
Resources
How to Use Web Site
Systems Engineering Analysis
Project Documents
ITS Architecture
ITS Standards
Glossary
Feedback
Interconnect: ODOT District 2 Office - ODOT District 2 ITS Field Equipment
(Click on image to view full-size)
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source
Architecture Flows
Destination
ODOT District 2 Office
vehicle signage data (P)
vehicle messages_ud (P)
environmental sensors control (P)
hri request (P)
hri control data (P)
roadway information system data (E)
signal system configuration (E)
signal control plans (E)
signal control device configuration (E)
signal control commands (E)
traffic sensor control (E)
ODOT District 2 ITS Field Equipment
ODOT District 2 ITS Field Equipment
short range communications status (P)
vehicle based information_ud (P)
environmental sensor data (P)
right-of-way request notification (E)
hri status (P)
roadway information system status (E)
signal fault data (E)
signal control status (E)
traffic probe data (P)
traffic flow (E)
ODOT District 2 Office