Interface: OTC Central Dispatch and OTC Website
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
OTC Central Dispatch | road network conditions (P) | OTC Website |
OTC Website | OTC Central Dispatch |