NOACA Regional ITS Architecture
Interface: OTC Central Dispatch and OTC Field Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
OTC Central Dispatch
roadway information system status (P)
roadway obstructions system control_ud (P)
roadway information system data (E)
traffic sensor control (P)
freeway control data (P)
OTC Field Equipment
OTC Field Equipment
roadway information system data (P)
roadway obstructions data_ud (P)
roadway information system status (E)
traffic flow (P)
freeway control status (P)
OTC Central Dispatch
Last updated: 03-17-10