Interface: ODOT 511 Information System and Buckeye Traffic
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
ODOT 511 Information System | ISP coordination (P) | Buckeye Traffic |
Buckeye Traffic | ISP coordination (P) | ODOT 511 Information System |