NOACA Regional ITS Architecture
Interface: OTC Maintenance Dispatch and OTC Maintenance and Construction Vehicles
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
OTC Maintenance Dispatch
maint and constr vehicle system control (P)
maint and constr dispatch information (P)
OTC Maintenance and Construction Vehicles
OTC Maintenance and Construction Vehicles
work zone status (P)
maint and constr vehicle operational data (P)
maint and constr dispatch status (P)
maint and constr vehicle conditions (P)
maint and constr vehicle location data (P)
OTC Maintenance Dispatch
Last updated: 03-17-10