ODOT Traffic Signals and Private Rail Wayside Equipment

(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned

Send Your Comments
SourceArchitecture FlowsDestination
ODOT Traffic Signals hri operational status (P)

Private Rail Wayside Equipment
Private Rail Wayside Equipment track status (E)

ODOT Traffic Signals

Last updated: 10-22-09