ODOT Traffic Signals and Private Rail Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
ODOT Traffic Signals
hri operational status (P)
Private Rail Wayside Equipment
Private Rail Wayside Equipment
track status (E)
ODOT Traffic Signals
Last updated: 10-22-09