New Mexico Statewide ITS Architecture
Interface: Rio Metro RTD Operations Center and Rio Metro RTD Transit Vehicles
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
Rio Metro RTD Operations Center
request for vehicle measures (P)
secure area surveillance control (P)
alarm acknowledge (P)
transit vehicle operator information (P)
Rio Metro RTD Transit Vehicles
Rio Metro RTD Transit Vehicles
transit vehicle conditions (P)
secure area surveillance data (P)
alarm notification (P)
transit vehicle loading data (P)
fare collection data (P)
demand response passenger and use data (P)
transit vehicle schedule performance (P)
transit vehicle location data (P)
Rio Metro RTD Operations Center
Last updated: 10-10-12