Interface: Rio Metro RTD Operations Center and Tribal Transportation Operations
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
Rio Metro RTD Operations Center | Tribal Transportation Operations | |
Tribal Transportation Operations | road network conditions (P) | Rio Metro RTD Operations Center |