Interface: County ITS Field Equipment and Rail Operators Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
County ITS Field Equipment | hri operational status (P) | Rail Operators Wayside Equipment |
Rail Operators Wayside Equipment | track status (E) | County ITS Field Equipment |