Interface: County ITS Field Equipment and NMDOT Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
County ITS Field Equipment | hri operational status (P) | NMDOT Wayside Equipment |
NMDOT Wayside Equipment | track status (E) | County ITS Field Equipment |