Interface: Container Systems and US Border Inspection Systems
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
Container Systems | container tag data_ud (P) | US Border Inspection Systems |
US Border Inspection Systems | Container Systems |