New Mexico Statewide ITS Architecture
Interface: Rail Runner Operations and Rail Runner Transit Rail Vehicles
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Send Your Comments
Source
Architecture Flows
Destination
Rail Runner Operations
request for vehicle measures (P)
alarm acknowledge (P)
secure area surveillance control (P)
transit vehicle operator information (P)
train operations data_ud (P)
Rail Runner Transit Rail Vehicles
Rail Runner Transit Rail Vehicles
transit vehicle conditions (P)
alarm notification (P)
secure area surveillance data (P)
transit vehicle schedule performance (P)
transit vehicle location data (P)
Rail Runner Operations
Last updated: 10-10-12