Interface: NMDOT Wayside Equipment and Tribal ITS Field Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT Wayside Equipment | track status (P) | Tribal ITS Field Equipment |
Tribal ITS Field Equipment | hri operational status (P) | NMDOT Wayside Equipment |