Interface: NMDOT Traffic Signals and NMDOT Wayside Equipment
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT Traffic Signals | hri operational status (P) | NMDOT Wayside Equipment |
NMDOT Wayside Equipment | track status (P) | NMDOT Traffic Signals |