Interface: NMDOT Equipment Repair Facility and NMDOT Statewide TMC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT Equipment Repair Facility | NMDOT Statewide TMC | |
NMDOT Statewide TMC | field device status_ud (P) | NMDOT Equipment Repair Facility |