Interface: NMDOT DMS and NMDOT Statewide TMC
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT DMS | roadway information system status (E) | NMDOT Statewide TMC |
NMDOT Statewide TMC | roadway information system data (E) | NMDOT DMS |