Interface: NMDOT District 4 TOC and NMDOT Road Closure Gates
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
NMDOT District 4 TOC | barrier system control (E) | NMDOT Road Closure Gates |
NMDOT Road Closure Gates | barrier system status (E) | NMDOT District 4 TOC |