Interface: BIA Roads and Rio Metro RTD Operations Center
(E) = Existing Flow
(P) = Planned/Future Flow
(E/P) = Existing and Planned Flow - Flow appears as Existing and Planned
Source | Architecture Flows | Destination |
---|---|---|
BIA Roads | maint and constr work plans (P) current asset restrictions (P) | Rio Metro RTD Operations Center |
Rio Metro RTD Operations Center | BIA Roads |